International Subfloor Acceptance Protocol (NWFA / DIN)

Based on NWFA (North America), DIN / EN (Europe), and ASTM international standards.

Concrete Subfloor Requirements

  1. Flatness: ≤ 2 mm per 2 m (DIN 18202) or ≤ 1/8″ per 6′ (NWFA).
  2. Moisture: ≤ 2% CM for cement screed, ≤ 0.5% CM for anhydrite (EN / DIN). ASTM F2170 ≤ 75% RH.
  3. Strength: Minimum 3000 psi (NWFA) / C20/25 (EN).
  4. Vapor barrier: Recommended 6‑mil polyethylene (≈0.15 mm, perm ≤ 0.13).
  5. Cleanliness: No sealers, waxes, oils, paint, dust (NWFA / DIN 18356).
  6. No cracks or hollow spots.

Job Site Conditions

⚠️ Disclaimer: JOVI is an independent technical tool and is not affiliated with NWFA, DIN, CEN, or ASTM. This document is a professional summary of international requirements, including moisture testing (ASTM F2170) and surface flatness (DIN 18202). All calculations are provided for estimation purposes only.
← Back to JOVI Calculator